< Prev | Contents | Next > |
2.6. Fluid Engineering and Functions
![]() |
2.6.6. Increase Oil Ratio |

Task is used to perform calculations related to mud oil ratio increasing.
Input Values | ||
![]() |
Initial Oil Ratio | Oil Ratio before the operation |
![]() |
Desired Oil Ratio | Oil Ratio after the operation |
![]() |
Current Oil Content, Vol% | Oil content in the mud before the operation |
![]() |
Sp.Gr.Weighting Material | Specific gravity of weighting material |
![]() |
Added Oil Density | The density of the oil that is planned to be added to increase oil ratio |
![]() |
Initial Mud Volume | Mud volume before operation |
![]() |
Mud Density | The density of mud |
Results | ||
![]() |
Mud Density After Adding Oil | The density of mud after the oil was added |
![]() |
Required Oil Volume | Required volume of oil |
![]() |
Required Weighting Material | The required weight of weighting material |
![]() |
Volume Inc. Due Weight. Mat | The increase of mud volume due to adding of weighting material |
![]() |
Final Mud Volume | Mud volume after operation |
![]() |
Initial Oil Volume | The volume of oil in the mud before operation |
![]() |
Initial Water Volume | The volume of water in the mud before operation |
![]() |
Initial Solids Volume | The volume of solids in the mud before operation |
![]() |
Final Oil Content, Vol% | Oil content in the mud after the operation |
![]() |
Final Water Content, Vol% | Water content in the mud after the operation |
![]() |
Final Solids Content, Vol% | Solids content in the mud after the operation |