Task is used to perform calculations related to mud oil ratio decreasing.
Input Values |
 |
Initial Oil Ratio |
Oil Ratio before the operation |
 |
Desired Oil Ratio |
Oil Ratio after the operation |
 |
Current Oil Content, Vol% |
Oil content in the mud before the operation |
 |
Sp.Gr. Weighting Material |
Specific gravity of weighting material |
 |
Added Water / Brine Density |
The density of the water/brine that is planned to be added to decrease oil ratio |
 |
Added Water / Brine Salinity |
The Salinity of the water/brine that is planned to be added to decrease oil ratio |
 |
Salt Purity |
The purity of the salt in brine. Should be Greater than 0 and less than or equal 100 |
 |
Initial Mud Volume |
Mud volume before operation |
 |
Mud Density |
The density of mud |
 |
WPS of Mud |
Water phase salinity of mud |
Results |
 |
Mud Density After Adding Water / Brine |
The density of mud after the water / brine was added |
 |
Required Water / Brine Volume |
Required volume of water / brine |
 |
WPS of Mud After Adding Water / Brine |
Water phase salinity of mud after adding water/brine |
 |
Required Salt Concentration |
Required concentration of salt |
 |
Required Salt |
The required weight of salt |
 |
Mud Density after Adjusting Salinity |
Mud density after operation |
 |
Mud Volume after Adding Salt |
Mud Volume after Adding Salt |
 |
Required Weighting Material |
The required weight of weighting material |
 |
Volume Inc. Due Weight. Mat |
The increase of mud volume due to adding of weighting material |
 |
Final Mud Volume |
Mud volume after operation |
 |
Initial Oil Volume |
The volume of oil in the mud before operation |
 |
Initial Water Volume |
The volume of water in the mud before operation |
 |
Initial Solids Volume |
The volume of solids in the mud before operation |
 |
Final Oil Content, Vol% |
Oil content in the mud after the operation |
 |
Final Water Content, Vol% |
Water content in the mud after the operation |
 |
Final Solids Content, Vol% |
Solids content in the mud after the operation |