2.6. Fluid Engineering and Functions


2.6.7. Decrease Oil Ratio

Task is used to perform calculations related to mud oil ratio decreasing.

Input Values
Initial Oil Ratio Oil Ratio before the operation
Desired Oil Ratio Oil Ratio after the operation
Current Oil Content, Vol% Oil content in the mud before the operation
Sp.Gr. Weighting Material Specific gravity of weighting material
Added Water / Brine Density The density of the water/brine that is planned to be added to decrease oil ratio
Added Water / Brine Salinity The Salinity of the water/brine that is planned to be added to decrease oil ratio
Salt Purity The purity of the salt in brine. Should be Greater than 0 and less than or equal 100
Initial Mud Volume Mud volume before operation
Mud Density The density of mud
WPS of Mud Water phase salinity of mud
Results
Mud Density After Adding Water / Brine The density of mud after the water / brine was added
Required Water / Brine Volume Required volume of water / brine
WPS of Mud After Adding Water / Brine Water phase salinity of mud after adding water/brine
Required Salt Concentration Required concentration of salt
Required Salt The required weight of salt
Mud Density after Adjusting Salinity Mud density after operation
Mud Volume after Adding Salt Mud Volume after Adding Salt
Required Weighting Material The required weight of weighting material
Volume Inc. Due Weight. Mat The increase of mud volume due to adding of weighting material
Final Mud Volume Mud volume after operation
Initial Oil Volume The volume of oil in the mud before operation
Initial Water Volume The volume of water in the mud before operation
Initial Solids Volume The volume of solids in the mud before operation
Final Oil Content, Vol% Oil content in the mud after the operation
Final Water Content, Vol% Water content in the mud after the operation
Final Solids Content, Vol% Solids content in the mud after the operation